All-in-one Engineering Services is the key to successful Data Center operation. The goal of the Engineering Service is to provide highest performance in operating Data Center at all time with reliability and stable ability to prevent Data Center from interrupting and shutting down. Good Engineering Service should perform maintenance before and during Data Center operation; also when Data Center is in phase of expanding facility.
Contact the SITEM team on SITEM’s official LINE account @sitem or fill out the form at the end of this page for more information or any inquiries to SITEM’s products and services.
Shop Drawing Review
The objective of Shop Drawing Review is to check and audit installation procedures, assuring all systems are installed correctly as planned according to Engineering Standards with all tools necessary for repair and maintenance.
Check list, tool and test equipment preparation
This method is to provide check list document, tools list, and other required equipment appropriate to each product in order to consistently perform maintenance and unplanned repair.
Installation checking and commissioning
Installations are thoroughly checked and audited to make sure everything is properly installed.
Operation and trouble-shooting training
It is necessary to train all user or customer knowledge of how to handle basic foul-ups or alarms that may rise or happen during operation. User is required to learn how to function all systems installed for a smooth operation and if any problem occurred, it can be solved in a right manner and professionally.
Equipment database
SITEM keeps all record and database of all projects to analyze and evaluate information in order to perform effective maintenance starting from day 1. All detailed records will be helpful in usage of tracking what have been completed and errors that have already occurred can be analyzed to improve the system.
Preventive maintenance planning
Planning for maintenance is essential because all products installed within Data Center require regular maintenance for smooth application running in a long period of time.
Therefore, when Data Center starts to operate, we will generate suitable and appropriate maintenance schedule to minimize the risk of Data Center problems happening.
Servicing before activating the Data Center is an important step to ensure that every system and all Data Center equipment has been tested. Check for readiness before launch so that once the Data Center is activated it will continue to work without interruption.
Contact the SITEM team on SITEM’s official LINE account @sitem or fill out the form at the end of this page for more information or any inquiries to SITEM’s products and services.